Stockpile inventory for quarries and aggregates by drone
How quarries and aggregate yards run month-end stockpile inventory with a drone: the flight, the measurement, density to tonnage, and keeping the numbers defensible for the auditor.
Published · 7 min read · By Malya, the makers of Clarity
Stockpile inventory is the measurement a quarry gets judged on. It sets the value of stock on the books, it is the number the auditor tests, and when it is wrong by a few percent across a yard of twenty piles the write-off is real money. A drone makes the measurement fast and complete. Making it defensible is a matter of doing the same few things the same way each month, and writing them down.
Why drones took over the month-end count
The older methods each had a gap. Walking the piles with a GPS rover took a surveyor a day, measured a few hundred points per pile, and could not safely reach the top of anything steep. Counting truckloads (production less sales, by weighbridge) is the book figure itself, not a check on it. A drone flight of a 30 acre yard takes under half an hour, measures every pile to a few centimetres across millions of points, and leaves a picture of the yard on that date that can be re-measured years later. The flight is the easy part; the rest of this guide is the rest.
The monthly routine
- Fly on the close date, after the last sale and before the first load of the next period. Same height and overlap every month, nadir camera, the yard still: no loaders working the piles. (Flight settings.)
- Position it the same way every month. Ground control targets left in place around the yard, or RTK/PPK on the drone with three or four checkpoints. Month-on-month comparison needs the same datum each time more than it needs absolute accuracy. (What each method gives you.)
- Process to a surface model. The DSM, not the terrain model: a terrain model has the piles filtered out. (The three files.)
- Measure each pile against the right base, with the boundary on the ground around its toe. Reuse last month's boundaries where the pile has not moved; redraw where it has. (How the base is chosen, and why it matters most.)
- Convert to tonnes with a density per product, from a measured source.
- Reconcile to the book inventory and explain the variance, pile by pile.
- File the evidence: the flight, the boundaries, the bases, the densities, the reconciliation, in one place that can be reopened.
The yard's particular problems
Piles that merge
Two products pushed together over a month become one heap with a ridge somewhere in it. The volume of the heap is fine; the split between products is a judgement. Draw the boundary along the ridge, note that it was a judgement, and ask the yard to keep a gap. Better still, measure what each product's pile gained and lost against last month's flight, which does not care where the ridge is.
Piles against walls, in bins, on old stock
A pile against a retaining wall has no toe on that side; the base there is the wall's foot, which the camera cannot see. Use a fixed level or corner levels for the bin floor from the drawings, and keep the wall out of the boundary. A pile that has sat on the same spot for years is sitting on compacted old stock, and the "ground" under it is a decision: agree it once, with the auditor if need be, and use the same base every month.
Density
Volume is measured; tonnage is volume times a number nobody measured this month. Crushed stone products range from about 1.4 to 1.7 t/m³ loose and rise when wet; sand and fines move most with moisture. A density table with one value per product, reviewed yearly against a weighed sample or a pile built from weighed loads, is the minimum. Record which value was used for each pile each month.
The material in motion
Trucks loaded but not yet across the weighbridge, product on the belt, the load in the loader bucket. Fly when the yard is still and the cut-off is the flight time, and say so.
What the auditor is looking for
| Question | Evidence |
|---|---|
| When was it measured, and by whom? | Flight date and time, pilot, positioning method, checkpoint residuals |
| Is this the same pile as last month? | The boundary, drawn on the orthomosaic, kept with the flight; the earlier flight on the same timeline |
| What was it measured against? | The base printed beside the volume (fitted plane, lowest point, a level, last month's surface) and the fraction of the boundary measured |
| How did volume become tonnes? | The density applied, its source, the date it was last checked |
| Does it agree with the books? | The reconciliation, pile by pile, with the variance and its reason |
| Can I see it myself? | A link that opens the flight and the measurements without software, and an export of the numbers |
A measurement that lives in a spreadsheet with a screenshot answers the first and last of these badly. One that lives with the flight it was taken from, with the base and the boundary attached, answers them all. Clarity keeps every volume with its flight, prints the base and the area measured beside it, takes a density per measurement and prints the tonnes, puts every month on one timeline so last month's pile is a click away, and exports the lot as CSV or Excel. (Stockpile volumes in Clarity.)
A worked month
A 25 acre aggregate yard, 18 piles, flown at 80 m with RTK at 7 a.m. on the last day of the month, 310 photos, 14 minutes. Checkpoints agree to 2 cm vertically. Every pile measured against a best-fit plane through its toe, except two in concrete bins measured from the bin floor level. Densities per product from last spring's weighed samples. Total 142,600 t against a book figure of 146,900 t: a variance of 2.9%, of which 2,100 t is traced to a merged pile of two gradings split by eye, 1,400 t to fines valued at their dry density after a wet week, and the balance unexplained and written down. Next month the two gradings have a gap between them.
Questions people ask
How do quarries measure stockpile inventory?
Most now fly the yard with a drone at or near month end, process the photos into a surface model, draw a boundary around each pile and measure its volume against the ground under it, then convert to tonnes with a density per product. The figure is reconciled against the book inventory (opening stock plus production minus sales) and the difference is investigated or written off. Walking the piles with a GPS rover and counting truckloads are the older methods it replaced.
How accurate is drone stockpile inventory?
The volume of a well-defined pile on a flat, visible base is typically within one to three percent of the truth. The tonnage is less certain than the volume, because density varies with product, moisture and compaction by five to fifteen percent. Most of the variance auditors see comes from density, from piles that merge, and from the base under a pile that has been there for years, not from the drone.
What density do I use for aggregates?
A measured one, per product, if at all possible: weigh a known volume, or back-calculate from a pile that was built from weighed trucks. Published values for crushed stone run from about 1.4 to 1.7 t/m³ (2,400 to 2,900 lb/yd³) loose, with sand and fines at the low end when dry and higher when wet. Using one density for everything is the single largest avoidable error in an inventory.
How often should stockpiles be flown?
Monthly is the usual rhythm, timed to the accounting close, with a quarterly or annual flight witnessed or reviewed for the audit. Sites with fast-moving product fly more often; a drone on site makes a weekly flight a half-hour job. Fly on the same day of the cycle each time, after the last load has left and before the first arrives.
What does an auditor want to see?
That the number can be traced: the flight date and who flew it, the positioning used, the boundary drawn for each pile and the base it was measured against, the density applied and where it came from, and the reconciliation to the book figure with the variance explained. A measurement kept with the flight it was taken from, that anyone can reopen later, answers most of the questions before they are asked.
Do it in Clarity.
Explore is free, with no card and no expiry: a real quarry, already flown, to try every tool on. Studio is $50 a month for up to five sites of your own ground, from the orthomosaic and terrain model you already have. Enterprise processes your photos.
Read next
- How to choose drone survey softwareSix questions to ask any platform before you pay for it.
- Stockpile volume calculator: cone and windrow piles, with tonnesVolume and tonnes from base and height, for a cone or a windrow.
- Cut and fill calculator: average end area between cross-sectionsCut, fill and net from the areas on your cross-sections, by average end area.
- All guides